Major Projects

Country
Vietnam
Service
Urban railway
Dept.
Urban railway department

Ho Chi Minh City Urban Railway Construction Project (Ben Thanh-Suoi Tien Section (Line 1))

Basic Project Information

CountryVietnam
ClientManagement Authority for Urban Railways (MAUR)
Implementation periodDecember 2007 to date
ResponsibilitiesO&M (mainly manual preparation, training of drivers, dispatchers and station managers)

Project Outline

Along with rapid population and economic growth, Ho Chi Minh City, the largest city in Vietnam, has been suffering from air pollution and traffic congestion caused by motorcycles and automobiles, which are the main means of transportation for its citizens. Ho Chi Minh City Urban Railway Line 1, under construction with yen loans, is the first urban railway project in Ho Chi Minh City and is regarded as the last resort to solve these problems. The total length of the line is 19.7 km, connecting Ben Thanh Station in the center of the City to Suoi Tien Terminal Station in the northeast via a 2.5 km underground section and a 17.2 km viaduct section.

As a member of the joint venturewhose lead manager is Nippon Koei Co., Ltd., and being responsible for supervising construction work, we are in charge of O&M, mainly training the operating staff, preparing manuals and other related work. In July 2020, we started driver training at the Vietnam Railway College as an outsourcing contract of the joint venture. This first urban railway line in HCMC was inaugurated on 22nd December 2024.

 

Data

Total length19.7 km (Ben Thanh Station-Suoi Tien Station)
Underground section2.6 km, 3 stations
Viaduct section17.1 km, 11 stations
TOP